어플

Doosan Enerbility has signed a contract to build a 1 trillion won complex thermal power plant in Kazakhstan

Business / 김지선 / 03/16/2023 06:01 AM
This article is translated by AI company Flitto and Alhpa Biz neural machine translation technology
두산에너빌리티가 2020년 카자흐스탄에 준공한 카라바탄 복합화력발전소 전경. (사진=두산에너빌리티)

 

[Alpha Biz=(Chicago) Reporter Kim Jisun] Doosan Enerbility said on the 15th that it has signed a 1.15 trillion won contract with Turkestan LLP, a subsidiary of Kazakhstan's sovereign wealth fund Samruk-Kazyna, to build a combined thermal power plant. The Kazakh government is investing in the energy, railway and defense industries using sovereign wealth funds.

Doosan Enerbility will form a consortium with local construction company Bajis to build a 1,000MW (megawatt) complex thermal power plant in Shymkent, an industrial area in southern Kazakhstan.

The Shymkent combined thermal power plant is scheduled to be completed in August 2026, and will be carried out by the EPC (Design, Procurement, and Construction) method in which Doosan Enerbility performs the entire process from design to equipment supply, installation, and trial operation.

 

 

AlphaBIZ 김지선(stockmk2020@alphabiz.co.kr)

Related articles

[Exclusive] Samsung Electronics to Supply HBM3E 12-High Stacks to NVIDIA
DL E&C Executives Resign En Masse Following Fatal Construction Site Accident
POSCO Future M Terminates KRW 945 Billion ESS Cathode Material Supply Contract, Signs New LFP Partnership with CNGR
Hahn & Company Selects TKG Taekwang as Preferred Bidder for Sale of Semiconductor Parts Maker Solmix
Hyundai Motor Group Bolsters SDV and Autonomous Driving Capabilities with KRW 500.3 Billion Investment in 42dot
comments >

SNS